Skip to content

chore(main): release 0.2.6#299

Merged
ozzy-3 merged 2 commits into
mainfrom
release-please--branches--main--components--ozzylabs-opshub
May 31, 2026
Merged

chore(main): release 0.2.6#299
ozzy-3 merged 2 commits into
mainfrom
release-please--branches--main--components--ozzylabs-opshub

Conversation

@github-actions
Copy link
Copy Markdown
Contributor

@github-actions github-actions Bot commented May 31, 2026

🤖 I have created a release beep boop

0.2.6 (2026-05-31)

Added

  • connectors/google_calendar: events api sync token + master event mapper + override + cursor + fallback (Phase 14 G4) (#301) (a4cefab)
  • connectors/google_mail: gmail api history + message mapper + cursor + fallback (#303) (3c621c1)

Changed

  • connectors/google_auth: shared OAuth foundation + 3-scope expansion (Phase 14 G2) (#300) (bd74191)

Documentation

  • adr,plan: adr-0010 + 0014 amendments + phase-14-plan (Gmail + Google Calendar) (#298) (f5d43c8)
  • phase 14 audit cluster B2 (Phase 14+ → 15+ unification + anchor links + outlook + mapper symmetry counts) (#312) (02667d7), closes #307
  • phase 14 audit cluster C (operator-facing docs vs code drift) (#310) (bfefa82)
  • phase 14 closeout (docs + e2e + status lines + phase-13 forecast realign) (#304) (ab0b792)
  • skills: phase 14 audit cluster B1 (SKILL.md vocabulary 反映漏れ修正) (#311) (16504fc)

This PR was generated with Release Please. See documentation.

@github-actions github-actions Bot force-pushed the release-please--branches--main--components--ozzylabs-opshub branch 6 times, most recently from ee56f0a to e806e40 Compare May 31, 2026 16:54
@github-actions github-actions Bot force-pushed the release-please--branches--main--components--ozzylabs-opshub branch from f3f057e to 40c2018 Compare May 31, 2026 17:19
@ozzy-3 ozzy-3 merged commit 6b2585c into main May 31, 2026
@ozzy-3 ozzy-3 deleted the release-please--branches--main--components--ozzylabs-opshub branch May 31, 2026 22:07
@github-actions
Copy link
Copy Markdown
Contributor Author

🤖 Created releases:

🌻

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Phase 14 audit cluster B2: Phase 14+ → Phase 15+ 統一 batch + anchor link + outlook 整理

1 participant