Skip to content

docs: bound repository hygiene at release and installation - #20

Open
pcvantol wants to merge 1 commit into
mainfrom
codex/project-hygiene-reconciliation-architecture
Open

docs: bound repository hygiene at release and installation#20
pcvantol wants to merge 1 commit into
mainfrom
codex/project-hygiene-reconciliation-architecture

Conversation

@pcvantol

@pcvantol pcvantol commented Sep 8, 2026

Copy link
Copy Markdown
Owner

Coordinated documentation increment

PROJECT_HYGIENE_AND_REPOSITORY_RECONCILIATION_V1, coordinated with pcvantol/forge#59, pcvantol/engineering-platform#108 and pcvantol/workspace#17.

Defines hygiene assessments as source/repository/operation-scoped inputs, not global release vetoes or substitutes for artifact integrity, publication and external CD authority. Unrelated retained branches do not block every release; genuinely applicable stale/missing mandatory evidence still blocks the dependent operation.

Installation/update/uninstall cannot prune project refs/worktrees, erase cases/receipts, delete rollback history or activate delete permission. Forge remains project reasoning owner and EP remains repository observation/mutation owner.

Adds architecture, scoped HY-P roadmap and parent roadmap entry. Documentary target only; all implementation/qualification remains PLANNED. No schema, source/runtime implementation, package version, manifest pin, workflow, credential, grant, actual cleanup, publication or installed state changes. No new first-canary prerequisite.

Coordinated DAG has been structurally checked locally (10 nodes / 13 dependencies). Owning hosted checks must qualify this exact PR head; no local full repository suite or host test is claimed.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant