Skip to content

chore: bump pins — portfolio v0.16.0, project_board v0.29.3 — re-verify against core 0.93.1#28

Merged
mabry1985 merged 1 commit into
mainfrom
chore/board-0.29.3
Jul 6, 2026
Merged

chore: bump pins — portfolio v0.16.0, project_board v0.29.3 — re-verify against core 0.93.1#28
mabry1985 merged 1 commit into
mainfrom
chore/board-0.29.3

Conversation

@mabry1985

Copy link
Copy Markdown
Contributor

Carries yesterday's unfinished pins branch (chore/bump-pins-verify-0.93.1, cherry-picked) plus one more notch on the board pin.

Why v0.29.3 specifically (delivery-loop plan M0 / M7 "patch early"): it force-disables manage_git on the board's scoped coder dispatch (projectBoard-plugin#69). The teams this stack provisions run manage_git: true coders from the team template — on ≤v0.29.2 the board's dispatch double-runs the git lifecycle and every board-built feature gets duplicate branches/PRs.

Companion: protoLabsAI/leadEngineer#5.

🤖 Generated with Claude Code

@protoquinn

protoquinn Bot commented Jul 6, 2026

Copy link
Copy Markdown

👀 Quinn is reviewing — verdict (PASS / WARN / FAIL) + findings to follow.

@protoquinn protoquinn Bot left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

QA Audit — PR #28 | chore: bump pins — portfolio v0.16.0, project_board v0.29.3 — re-verify against core 0.93.1

VERDICT: WARN


CI Status

  • No CI checks found for head d79b2ba — CI not accessible to reviewer (Gap)

Diff Review

  • Single-file bump in protoagent.bundle.yaml: verified_against 0.81.0→0.93.1, portfolio v0.14.7→v0.16.0, project_board v0.25.0→v0.29.3
  • All bumps are forward; no downgrades or reordering
  • Rationale in PR body for the board v0.29.3 pin is clear: force-disables manage_git on scoped coder dispatch (projectBoard-plugin#69), preventing duplicate branches/PRs on provisioned teams

Observations

  • GAP: Cannot verify tags v0.16.0 (portfolio-plugin) and v0.29.3 (projectBoard-plugin) exist — tooling doesn't support cross-repo tag checks. Author should confirm both tags are pushed before merging.
  • GAP: No CI checks visible to reviewer — unable to confirm the verify workflow ran against core 0.93.1 as the verified_against bump implies.

No blocking defects found. The approve-on-green policy does not apply (no CI pipeline detected), so a human should confirm the tags exist and merge manually.

— Quinn, QA Engineer

@protoquinn

protoquinn Bot commented Jul 6, 2026

Copy link
Copy Markdown

Submitted COMMENT review on #28.

v0.29.3 force-disables manage_git on the board's scoped coder dispatch
(projectBoard-plugin#69) — on ≤v0.29.2 a manage_git:true team coder gets a
second full git lifecycle from the adapter and every feature ships duplicate
branches/PRs.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
@mabry1985 mabry1985 force-pushed the chore/board-0.29.3 branch from d79b2ba to dc2edd9 Compare July 6, 2026 07:42
@protoquinn

protoquinn Bot commented Jul 6, 2026

Copy link
Copy Markdown

✅ CI went terminal-green with no blockers on the prior review — promoting it to APPROVED per the approve-on-green policy (#748).

@protoquinn protoquinn Bot left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

CI terminal-green, no blockers on prior review — auto-approving on green (#748).

@protoquinn protoquinn Bot left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

QA Audit — PR #28 | chore: bump pins — portfolio v0.16.0, project_board v0.29.3 — re-verify against core 0.93.1

VERDICT: WARN


CI Status

  • bump: skipped
  • verify: queued ⏳

CI is still settling. The approve-on-green policy will promote this review to APPROVED automatically once every check passes — no manual re-review needed when CI goes terminal-green.

Diff Review (incremental: d79b2badc2edd9)

  • Single-line forward bump: project_board v0.29.2 → v0.29.3
  • Rationale in PR body is clear: force-disables manage_git on scoped coder dispatch (projectBoard-plugin#69), preventing duplicate branches/PRs on provisioned teams
  • All prior bumps (portfolio v0.16.0, verified_against 0.93.1) carried forward unchanged

Observations

  • GAP: Cannot verify tag v0.29.3 exists on protoLabsAI/projectBoard-plugin — tooling doesn't support cross-repo tag checks. Author should confirm before merge.
  • GAP: CI verify check is queued — unable to confirm the verify workflow passes against core 0.93.1 until it completes. The approve-on-green policy handles this automatically once it settles.

No blocking defects. The one-line change is forward-only and well-motivated.

— Quinn, QA Engineer

@protoquinn

protoquinn Bot commented Jul 6, 2026

Copy link
Copy Markdown

Submitted COMMENT review on protoLabsAI/portfolio-manager-stack#28.

@mabry1985 mabry1985 merged commit cd1f11e into main Jul 6, 2026
2 checks passed
@mabry1985 mabry1985 deleted the chore/board-0.29.3 branch July 6, 2026 07:43
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant