Upgrade IX-StellaratorForge to v0.9.0 integrated campaign - #3
Merged
Conversation
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Upgrades IX-StellaratorForge from v0.5.0 to v0.9.0 with the SFR-2 actuation overlay, SFR-3 field integrity and dual-boundary studies, and the SFR-4 integrated physical-promotion campaign.
Included work
Adds new reactor configurations, schemas, provenance records, evidence contracts, and reproducible result artifacts.
Adds complete architecture BOMs for the SFR-2 actuation overlay, SFR-3 field integrity shell, SFR-3 dual-boundary architecture, and SFR-4 integrated campaign.
Adds deterministic tests for actuation, synthetic controllability, dual-boundary behavior, heat exhaust, and the integrated campaign.
Expands the reactor documentation through the SFR-4 decision and promotion gates.
Preserves explicit scientific claim boundaries. Physical confinement, ignition, net-electric fusion, qualified magnets, full 3D TBR, and hardware operation remain unproven.
Verification
python check_stellarforge.pyResult:
IX-STELLARATORFORGE: GREENThe full self-contained test suite passes. The release manifest covers 301 files, and the staged commit passes Git whitespace validation.
Current SFR-4 result
The integrated campaign executed 80 direct-filament coil cases and produced zero topology passes. The declared nominal and steady heat-envelope screen passes, while equilibrium, transport, transient heat, qualified magnets, TBR, and fusion remain unproven.